
£1M+
Saved by deferring a scheduled ILI run
Accurate predictive modelling of corrosion saves over £1 million
ALERT's corrosion modelling gave a global operator a defensible case for exemption from a scheduled inline inspection on a late-life North Sea pipeline.














